|
|
|
|
|
Redlands, CA. Three Phase Transformers Mounted on Platform Between Two Poles. |
Joe Maurath, Jr. |
March 26, 2020 |
|
151 |
Ponoma, CA. Substation with 66kv Transformers, Switching and Other Gear. |
Joe Maurath, Jr. |
March 26, 2020 |
|
151 |
Fontana, CA. Old 4kv Residential Distribution Transformer. |
Joe Maurath, Jr. |
March 26, 2020 |
|
147 |
W. Covina, CA. 66kv Corner (Side Tap) Pole Using Suspension Insulator Deadends. |
Joe Maurath, Jr. |
March 26, 2020 |
|
135 |
San Bernardino, CA. Double Circuit 33kv Pole with Multipart Porcelain Insulators. |
Joe Maurath, Jr. |
March 26, 2020 |
|
127 |
Long Beach, CA. Old 4kv Distribution Transformer with Plug Style Fuse Cutout. |
Joe Maurath, Jr. |
March 26, 2020 |
|
159 |
West Covina, CA. Three Distribution Transformers with Several Openwire Services |
Joe Maurath, Jr. |
March 26, 2020 |
|
143 |
Long Beach, CA. Old 4kv Distribution Transformer with Plug Style Fuse Cutout. |
Joe Maurath, Jr. |
March 26, 2020 |
|
148 |
Long Beach, CA, 4kv Residential Distribution Along Alley, Pole Top Extension. |
Joe Maurath, Jr. |
March 26, 2020 |
March 31 |
131 |
Long Beach, CA. 12kv on Pole Extension with Old 4kv 3-phaseTransformer Bank |
Joe Maurath, Jr. |
March 19, 2020 |
|
173 |
Yucaipa, CA. 12kv Deadends Using Suspension Insulators on Crossover Pole. |
Joe Maurath, Jr. |
March 19, 2020 |
|
152 |
Yucaipa, CA. Three Phase 12kv Transformers on Platform, Heavy Openwire Secondary Cables |
Joe Maurath, Jr. |
March 19, 2020 |
|
162 |
San Bernardino, CA. Old Three Phase Transformer Bank Mounted Between Two Poles. |
Joe Maurath, Jr. |
March 19, 2020 |
|
153 |
San Bernardino, CA. 4kv Primaries with an Old 3-phase Transformer Bank. |
Joe Maurath, Jr. |
March 19, 2020 |
|
155 |
Steel Subtransmission Lattice Towers Along Los Angeles Street. |
Joe Maurath, Jr. |
March 19, 2020 |
|
147 |
Old Lattice Tower Used by LADWP and Southern California Edison (SCE). |
Joe Maurath, Jr. |
March 19, 2020 |
|
145 |
Los Angeles Dept. of Water and Power (LADWP) and SCE LatticeCorner Tower |
Joe Maurath, Jr. |
March 19, 2020 |
|
141 |
Los Angeles Dept. of Water and Power (LADWP) 287kv Double Circuit Tower. |
Joe Maurath, Jr. |
March 11, 2020 |
|
185 |
W. Covina, CA. Double Circuit 12kv Pole with Safety Grounding Taps. |
Joe Maurath, Jr. |
March 11, 2020 |
|
166 |
Huntington Beach, CA. Platform Mounted Pair of Street Lighting Regulators. |
Joe Maurath, Jr. |
March 11, 2020 |
|
162 |
W. Covina, CA. Oval Distribution Transformer with Cooling Tubes. |
Joe Maurath, Jr. |
March 11, 2020 |
|
170 |
W. Covina, CA. Platform-Mounted Three Phase Transformer Bank. |
Joe Maurath, Jr. |
March 11, 2020 |
|
166 |
San Bernardino, CA. Corner Pole with 4kv Transformer, Plug-In Cutout and Insulators. |
Joe Maurath, Jr. |
March 11, 2020 |
|
160 |
Brown Insulators and Open Cutouts Removed From Former Transformer Pole |
Joe Maurath, Jr. |
March 11, 2020 |
|
184 |
L.A. Vicinity: New Fuse Cutouts for Upgraded Pole. |
Joe Maurath, Jr. |
March 11, 2020 |
|
159 |
Top Section of Removed 11kv Pole with Brown Insulators and Open Cutouts. |
Joe Maurath, Jr. |
March 11, 2020 |
|
179 |
115kv Connections and Switchgear at CalElectric Substation |
Joe Maurath, Jr. |
March 11, 2020 |
|
148 |
San Bernardino, CA. 33kv 4-Circuit Lattice Tower with Multipart Porcelain Insulators. |
Joe Maurath, Jr. |
March 11, 2020 |
|
140 |
San Bernardino, CA. 4-Circuit 33kv Lattice Corner Tower at 115kv Substation. |
Joe Maurath, Jr. |
March 11, 2020 |
|
133 |
San Bernardino, CA. Steel Lattice Pole with Wood Crossarm. |
Joe Maurath, Jr. |
March 11, 2020 |
|
141 |
J-D disks on distribution |
David Dahle |
March 1, 2020 |
|
213 |
San Bernardino, CA. 33kv Corner Pole Making 90-degree Bend Using Deadends on Alley Arms |
Joe Maurath, Jr. |
February 29, 2020 |
|
171 |
San Bernardino, CA. View 2 of 115kv to 33kv Substation. |
Joe Maurath, Jr. |
February 29, 2020 |
|
144 |
San Bernardino, CA. View 1 of 115kv to 33kv Substation. |
Joe Maurath, Jr. |
February 29, 2020 |
|
139 |
San Diego Vicinity. Old Westinghouse Distribution Transformer. |
Joe Maurath, Jr. |
February 29, 2020 |
|
164 |
Santa Ana, CA. Delta Connected Transformer, 12kv to 120/240 Volts Secondary. |
Joe Maurath, Jr. |
February 29, 2020 |
|
150 |
Rubidoux, CA. Lineman Atop 66kv Pole Tying Wire to Large Multipart Insulator. |
Joe Maurath, Jr. |
February 29, 2020 |
|
169 |
Fullerton, CA. Old 12kv to 2.3 or 4kv Stepdown Transformer. |
Joe Maurath, Jr. |
February 29, 2020 |
|
158 |
Los Angeles Vicinity. Platform Transformer Bank. |
Joe Maurath, Jr. |
February 29, 2020 |
|
148 |
W. Covina, CA. Line Crews Working on 66kv Subtransmission Pole. |
Joe Maurath, Jr. |
February 29, 2020 |
|
143 |
W. Covina, CA. Line Crews Working on 66kv Subtransmission Circuits. |
Joe Maurath, Jr. |
February 29, 2020 |
|
138 |
Hemet, CA. 33kv Pole with KPF (brand) Disconnect Switch, Old Distribution Gear. |
Joe Maurath, Jr. |
February 29, 2020 |
|
167 |
Hemet, CA. Three Old Crossarm Mounted Transformers. |
Joe Maurath, Jr. |
February 29, 2020 |
|
153 |
The end of the line 2 |
Hagen Stamps-Hill |
February 17, 2020 |
|
234 |
The end of the line |
Hagen Stamps-Hill |
February 17, 2020 |
|
226 |
San Bernardino, CA. 115kv Wishbone Construction Pole Line. |
Joe Maurath, Jr. |
February 16, 2020 |
|
201 |
Rialto, CA. 1950s Fisher Pierce Tube Powered Photoelectric Lighting Control. |
Joe Maurath, Jr. |
February 16, 2020 |
|
179 |
W. Covina, CA, 66kv Double Circuit Switch Pole Replacement. |
Joe Maurath, Jr. |
February 16, 2020 |
|
166 |
Alhambra, CA. Street Lighting Regulator Activated by Master Loop. |
Joe Maurath, Jr. |
February 16, 2020 |
|
182 |
San Diego, CA. Early Rectangular Westinghouse Distrubution Transformer. |
Joe Maurath, Jr. |
February 16, 2020 |
|
170 |