Phase 2 Clear

By Jim Moody; posted August 19, 2021

View Original (3000 x 4000) 3678KB

 


Phase 1 was build the frame out of poles and cross arms. Then put the fence in. About a 4x9 structure with 4 ft fence. Bottom half will be about 1500 clear and Phase 3 will be adding about 1500 colored. Got the idea from Steve Blair. Phase 4 will be to add cross arms with pins and insulators and maybe a Rail Road crossing sign. I will post pictures as progress continues.

633951720