New pole, day 2

By James Mulvey; posted September 13, 2017

View Original (1872 x 1296) 778KB

 


Two days of grunt work on the new pole has the first 118 suspensions hung. Several insulator pole sculptures inhabit the area around where I am working. From atop the scaffolding I was provided with a birds eye view of all of them; a unique and totally different perspective. I used the opportunity to take a some pictures from this advantage point I never thought I would be at. Even the [id=452703016;Zebra Tree] which is on a 24 ft pole looks diminished when viewed from the area of the new pole top..

509918972