Line Construction 101, Hoisting Arm

By Brent Burger; posted November 11, 2002

View Original (499 x 640) 31KB

 


Next, we bring up all hardware and framing to build the pole to specs before wire is rolled out and pulled. Man on pole has located a pulley to the poletop and ground man is bringing the ten pin arm up to him on the rope. Note that great old truck with side curtains!

41567669