Installed in 1951, but much older looking. This 34.5kv to 4kv delta Cleveland Electric Illuminating sub may have replaced a municipal power plant supplying this town. Now taken down as 13kv Y connected lines have eliminated the old 4kv. Picture taken 1970. |