Originally installed in 1895, the T-H 9200 held 00 gauge copper wires, with voltages at 3,300 volts. The transmission line ran from the Pelzer Lower Dam to the Pelzer Cotton Mills of the Pelzer Manufacturing Company. The entire electrical installation was done by the General Electric Company. (video courtsey Jeff Kraemer; posted with permission) |