VIDEO: Rescuing a CD 245 off a Pole in Pelzer (0:58 mins)

By Bill Meier; posted December 17, 2012
View Original: Click to zoom, then click to magnify (45 x 20) 1KB


Originally installed in 1895, the T-H 9200 held 00 gauge copper wires, with voltages at 3,300 volts. The transmission line ran from the Pelzer Lower Dam to the Pelzer Cotton Mills of the Pelzer Manufacturing Company. The entire electrical installation was done by the General Electric Company.

(video courtsey Jeff Kraemer; posted with permission)

360329634