View Original: Click to zoom, then click to magnify(2048 x 1536) 713KB
The next step was to get all the conductors in position on the cross arm and ready to tension (sag). I used a rope sling to keep them in place while tensioning. Usually aluminium rollers are used for this but rope is much cheaper.