All the tools and material set out by each pole in preparation for installation of communication and power cross arms. There's a lot of nuts, bolts, different washers, cross arms, braces and down guy materials to be gathered when doing a project like this. I've been saving "stuff" for four years. The utility yard dumpster diving and UPRR pole line removal material is coming in quite handy at this time. |