Substation reconstruction 02

By Zoltán Drinóczi; posted April 28, 2006

View Original: Click to zoom, then click to magnify (1280 x 960) 578KB

 


Here is the old transformer with the 10 kV busbars. Green-Yellow-Red are the L1 L2 L3 phases. The 120 kV side's Y point is fix earthed, the 10 kV side in Zeg-Zug (Mixed Y), it's Y point have "long erath" by a resistor because of the eathcable grid...

150794478