AlbumUp to Main Album Listing
   FolderLine Construction Details

Do you enjoy the Picture Poster?
Are you an ICON Sponsor?
PayPal button
Title Name Date Updated Hits
Colton, CA. Wishbone Construction 115kv Crossing Over 66kv Line on Same Pole. Joe Maurath, Jr. April 8, 2020 115
West Covina, CA. Rear View of Old Pole Mounted 12kv Three Phase Transformer. Joe Maurath, Jr. April 8, 2020 126
Los Angeles Vicinity. Looking Up at a Gang Operated KPF Solid Blade Switch. Joe Maurath, Jr. April 8, 2020 135
Westminster, CA. 12kv Three Phase Transformer Bank for Large Commercial Customer. Joe Maurath, Jr. April 8, 2020 129
Huntington Beach, CA. Constant Current Regulator for Series Street Light Circuit Joe Maurath, Jr. April 8, 2020 137
Huntington Beach, CA. Old 12kv Delta Connected Distribution Transformer. Joe Maurath, Jr. April 8, 2020 131
Rows of Southern California Edison Transmission Towers at Sunset. Joe Maurath, Jr. April 8, 2020 131
New crossarms on old poles Mark Grimek March 31, 2020 202
New crossarms on old poles Mark Grimek March 31, 2020 157
New crossarms on old poles Mark Grimek March 31, 2020 162
New crossarms on old poles Mark Grimek March 31, 2020 174
41.6kV double circuit David Dahle March 27, 2020 165
41.6kV double circuit David Dahle March 27, 2020 146
41.6kV double circuit David Dahle March 27, 2020 130
41.6kV double circuit David Dahle March 27, 2020 131
Lakewood, CA. Transposed Conductors Along Double Circuit 66kv Pole Line. Joe Maurath, Jr. March 26, 2020 180
West Covina, CA. Old 12kv Three Phase Distribution Transformer on Wood Pole. Joe Maurath, Jr. March 26, 2020 153
Redlands, CA. Three Phase Transformers Mounted on Platform Between Two Poles. Joe Maurath, Jr. March 26, 2020 141
Ponoma, CA. Substation with 66kv Transformers, Switching and Other Gear. Joe Maurath, Jr. March 26, 2020 138
Fontana, CA. Old 4kv Residential Distribution Transformer. Joe Maurath, Jr. March 26, 2020 138
W. Covina, CA. 66kv Corner (Side Tap) Pole Using Suspension Insulator Deadends. Joe Maurath, Jr. March 26, 2020 123
San Bernardino, CA. Double Circuit 33kv Pole with Multipart Porcelain Insulators. Joe Maurath, Jr. March 26, 2020 115
Long Beach, CA. Old 4kv Distribution Transformer with Plug Style Fuse Cutout. Joe Maurath, Jr. March 26, 2020 146
West Covina, CA. Three Distribution Transformers with Several Openwire Services Joe Maurath, Jr. March 26, 2020 132
Long Beach, CA. Old 4kv Distribution Transformer with Plug Style Fuse Cutout. Joe Maurath, Jr. March 26, 2020 134
Long Beach, CA, 4kv Residential Distribution Along Alley, Pole Top Extension. Joe Maurath, Jr. March 26, 2020 March 31 118
Long Beach, CA. 12kv on Pole Extension with Old 4kv 3-phaseTransformer Bank Joe Maurath, Jr. March 19, 2020 158
Yucaipa, CA. 12kv Deadends Using Suspension Insulators on Crossover Pole. Joe Maurath, Jr. March 19, 2020 139
Yucaipa, CA. Three Phase 12kv Transformers on Platform, Heavy Openwire Secondary Cables Joe Maurath, Jr. March 19, 2020 149
San Bernardino, CA. Old Three Phase Transformer Bank Mounted Between Two Poles. Joe Maurath, Jr. March 19, 2020 141
San Bernardino, CA. 4kv Primaries with an Old 3-phase Transformer Bank. Joe Maurath, Jr. March 19, 2020 142
Steel Subtransmission Lattice Towers Along Los Angeles Street. Joe Maurath, Jr. March 19, 2020 132
Old Lattice Tower Used by LADWP and Southern California Edison (SCE). Joe Maurath, Jr. March 19, 2020 131
Los Angeles Dept. of Water and Power (LADWP) and SCE LatticeCorner Tower Joe Maurath, Jr. March 19, 2020 127
Los Angeles Dept. of Water and Power (LADWP) 287kv Double Circuit Tower. Joe Maurath, Jr. March 11, 2020 172
W. Covina, CA. Double Circuit 12kv Pole with Safety Grounding Taps. Joe Maurath, Jr. March 11, 2020 152
Huntington Beach, CA. Platform Mounted Pair of Street Lighting Regulators. Joe Maurath, Jr. March 11, 2020 149
W. Covina, CA. Oval Distribution Transformer with Cooling Tubes. Joe Maurath, Jr. March 11, 2020 155
W. Covina, CA. Platform-Mounted Three Phase Transformer Bank. Joe Maurath, Jr. March 11, 2020 152
San Bernardino, CA. Corner Pole with 4kv Transformer, Plug-In Cutout and Insulators. Joe Maurath, Jr. March 11, 2020 143
Brown Insulators and Open Cutouts Removed From Former Transformer Pole Joe Maurath, Jr. March 11, 2020 165
L.A. Vicinity: New Fuse Cutouts for Upgraded Pole. Joe Maurath, Jr. March 11, 2020 140
Top Section of Removed 11kv Pole with Brown Insulators and Open Cutouts. Joe Maurath, Jr. March 11, 2020 154
115kv Connections and Switchgear at CalElectric Substation Joe Maurath, Jr. March 11, 2020 124
San Bernardino, CA. 33kv 4-Circuit Lattice Tower with Multipart Porcelain Insulators. Joe Maurath, Jr. March 11, 2020 123
San Bernardino, CA. 4-Circuit 33kv Lattice Corner Tower at 115kv Substation. Joe Maurath, Jr. March 11, 2020 120
San Bernardino, CA. Steel Lattice Pole with Wood Crossarm. Joe Maurath, Jr. March 11, 2020 127
J-D disks on distribution David Dahle March 1, 2020 201
San Bernardino, CA. 33kv Corner Pole Making 90-degree Bend Using Deadends on Alley Arms Joe Maurath, Jr. February 29, 2020 158
San Bernardino, CA. View 2 of 115kv to 33kv Substation. Joe Maurath, Jr. February 29, 2020 132

Next pictures Next 50 pictures